Process Constraint Finder

Find what limits your flow.

See the constraint. Test an improvement. Find the next one.

Switching scenarios resets the experiment.

Describe a process or decision

Include the steps, limits and decision you want to explore. AI proposes illustrative assumptions; the process engine computes the results.

0 / 2000 characters

Exact math · sample process

Find the next constraint

More assembly capacity helps—until packing becomes the limit. Improve the whole line, one constraint at a time.

Current constraint

Constraint: Assembly

This is the limiting cut. Adding capacity anywhere else will not raise output.

System output

Throughput: 4/hr

Baseline 4/hr · +0/hr (+0%)

10% more capacity here gives

+0.4/hr

Assembly at 4.4/hr → 4.4/hr total.

Process map

Select a step or connection to explore its capacity. Wide maps scroll sideways; use the zoom controls to fit or enlarge.

Map controlsZoom 100%
Process flow network. Select a step or flow label to model its capacity.
Constraint: red outline and glow mark the limiting cut
Saturated: all capacity used
Busy: 65% or more used
Spare capacity
Flow: moving dashes show direction, line width shows volume
Experiment

What if capacity changed?

4/hr

Effective capacity after rework: 4/hr. Use arrow keys to adjust. The map updates live.

Before 4/hrAfter 4/hr

Original scenario · Constraint: Assembly

All comparisons use the original scenario. Presets and plans replace the current experiment.

Focus your improvement

Where would 10% more help now?

Raise one capacity at a time. The gain is in total output.

Tied constraints can require joint improvements; a zero marginal gain does not mean a step is unimportant.

Model assumptions & limits
  • All capacities are finished units per hour at steady state.
  • Transport, queues and setup time are omitted. Every order follows the entire line.

This steady-state model omits queue variability, shared staffing and deadlines. Switching scenarios or reloading starts a fresh experiment.