Other Heavy and Civil Engineering Construction

NAICS 237990 · Heavy and Civil Engineering Construction · SBA size standard: $45 million average annual receipts

Firms in this industry build heavy civil infrastructure projects that are not classified elsewhere such as outdoor sports facilities, athletic fields, running tracks, retaining walls, dams, levees, water control structures, marine construction and specialized site preparation. For a contractor that designs and builds municipal athletic fields, running tracks and retaining walls, the specialists turn client RFPs into bids, bids into awarded contracts, contracts into permitting and material orders, and schedules into daily crew and equipment assignments. Blueprints, geotechnical reports, safety plans and regulatory sign-offs stay with the project manager and field engineer.

Start with these bots

What makes this business different

  • Complex bids that require takeoffs from plans, soil reports, labor and equipment rates, and bonding capacity
  • Multi-agency permitting that involves environmental reviews, stormwater plans, traffic control and utility locates
  • Heavy equipment and specialized assets such as compactors, graders, laser-guided finish rollers and erosion control materials that must be scheduled and maintained
  • Weather-dependent outdoor work with rain delays, freeze restrictions and seasonal bidding windows
  • Subcontractor coordination for electrical, irrigation, fencing and specialty surfacing trades
  • Daily safety tailboards, erosion control inspections, compaction testing and material delivery logs
  • Progress billing tied to pay applications, retainage and lien waivers from all tiers
  • Municipal clients who require prevailing wage, DBE participation tracking and final punch lists

Specialist bots

  • a worker at a wide table reviewing large rolled construction plans with a laptop and measuring wheel nearby

    Estimating Engineer

    Convert plan sets and specifications into accurate quantity takeoffs and cost estimates for bids.

    Works in: Ambitious Sheets, Ambitious Docs, Process Optimizer · Workflows: Bid and estimate preparation

    Automates

    • Organizes plan files and extracts quantities for earthwork, base and surfacing
    • Pulls subcontractor quotes into the estimate
    • Calculates labor and equipment hours
    • Drafts the bid form and proposal documents

    Stops for a person

    • The project manager reviews and adjusts markup and risk contingencies
    • A licensed engineer or principal approves the final bid number
  • a worker organizing stacks of construction contract documents and bond papers on a desk

    Contract Administrator

    Manage contract documents, bonds, insurance and initial mobilization requirements after award.

    Works in: Ambitious Docs, Contract Analyzer, Ambitious Tasks · Workflows: Contract award and mobilization

    Automates

    • Compares awarded contract against the bid
    • Tracks bond and insurance expiration dates
    • Drafts subcontractor agreements
    • Organizes pre-construction submittal packages

    Stops for a person

    • The owner signs all bonds, contracts and insurance certificates
    • The project manager approves subcontractor lists and schedules
  • a worker installing orange silt fence and erosion control matting along a graded slope at an outdoor construction site

    Permitting Coordinator

    Prepare and track all environmental, stormwater, traffic and utility permits required before and during construction.

    Works in: Ambitious Docs, Ambitious Tasks, Ambitious Sheets · Workflows: Permitting and regulatory compliance

    Automates

    • Lists every required permit by jurisdiction
    • Drafts stormwater and erosion control submittals
    • Tracks approval timelines and conditions
    • Generates daily compliance inspection checklists

    Stops for a person

    • The project engineer confirms technical accuracy of plans
    • People submit applications and attend agency meetings
  • a worker in a hard hat reviewing a printed schedule on the hood of a pickup truck at an active jobsite

    Field Scheduler

    Maintain the project schedule, assign crews and equipment, and produce look-ahead plans.

    Works in: Construction Scheduler, Ambitious Tasks, Ambitious Sheets · Workflows: Project scheduling and resource allocation

    Automates

    • Updates schedule logic and percent complete
    • Assigns specific operators and equipment to tasks
    • Produces three-week look-ahead schedules
    • Flags weather-sensitive activities

    Stops for a person

    • The superintendent adjusts crew assignments daily
    • The project manager approves schedule changes and recovery plans
  • a worker using a nuclear density gauge to test soil compaction on a freshly graded athletic field base

    Daily Operations Clerk

    Generate daily work assignments, safety records, test logs and progress documentation from the field.

    Works in: Ambitious Tasks, Ambitious Docs, Ambitious Sheets · Workflows: Daily field operations and quality control

    Automates

    • Creates crew and equipment dispatch lists
    • Produces daily tailboard safety topics
    • Logs material deliveries and test results
    • Organizes progress photos by location

    Stops for a person

    • The foreman confirms all quantities and notes
    • Certified technicians perform and sign off on compaction tests
    • The safety manager reviews tailboard records
  • a worker at a desk surrounded by invoices, lien waiver forms and a laptop showing a construction billing spreadsheet

    Progress Billing Specialist

    Compile quantities, subcontractor invoices and lien waivers into monthly pay applications.

    Works in: Ambitious Sheets, Ambitious Docs, Ambitious Tasks · Workflows: Progress billing and pay applications

    Automates

    • Calculates completed quantities from field logs
    • Tracks subcontractor invoices and waivers
    • Populates schedule of values
    • Drafts change order summaries

    Stops for a person

    • The project manager verifies all quantities and attachments
    • The owner approves and signs every pay application
  • a worker in a hard hat walking an athletic field with a clipboard marking items on a punch list near a newly installed running track

    Project Closeout Coordinator

    Assemble as-builts, warranties, punch lists and final lien releases for project completion.

    Works in: Ambitious Docs, Ambitious Tasks, Ambitious Sheets · Workflows: Project closeout and punch list

    Automates

    • Compiles operation and maintenance manuals
    • Tracks punch list items to completion
    • Organizes final lien waivers and releases
    • Prepares notice of completion documents

    Stops for a person

    • The project engineer stamps and certifies as-built drawings
    • The owner reviews and approves the final punch list and retainage release

Workflows

Bid and estimate preparation

Starts when: Receipt of an RFP, invitation to bid or client inquiry

  1. Download and organize plan sets, specifications and addenda
  2. Perform quantity takeoffs for earthwork, base, surfacing and drainage
  3. Obtain subcontractor and supplier quotes for specialized trades
  4. Build the cost estimate with labor, equipment, materials and overhead
  5. Draft the bid form and required bond or proposal documents

Watch for: Accurate earthwork volumes depend on correct existing and proposed contours; Prevailing wage and DBE goals must be incorporated into the bid

Contract award and mobilization

Starts when: Notice of award or signed contract

  1. Review contract documents and identify exceptions
  2. Secure performance and payment bonds
  3. Submit required insurance certificates and subcontractor lists
  4. Order long-lead materials and schedule initial subcontractor meetings
  5. Prepare the project schedule and submit for approval

Watch for: Many public contracts require pre-construction submittals before any work can begin; Bonding capacity must be confirmed before signing

Permitting and regulatory compliance

Starts when: After contract award and before site work

  1. Identify all required permits from city, county, state and federal agencies
  2. Prepare stormwater pollution prevention plan and erosion control drawings
  3. Submit traffic control plans and obtain right-of-way permits
  4. Coordinate utility locates and prepare dig permits
  5. Track approval dates and generate compliance checklists

Watch for: Environmental agencies may require biological or cultural resource surveys; Permit conditions often dictate work windows and monitoring requirements

Project scheduling and resource allocation

Starts when: Weekly and after weather or change events

  1. Update the master schedule with actual progress and revised logic
  2. Assign crews, operators and equipment to each activity
  3. Coordinate subcontractor start dates and material deliveries
  4. Identify critical path delays and propose recovery options
  5. Produce three-week look-ahead schedules for field and client review

Watch for: Outdoor work is highly sensitive to rain days and freeze-thaw cycles; Equipment availability must be balanced across multiple active sites

Daily field operations and quality control

Starts when: Each workday at project sites

  1. Generate daily crew and equipment assignments
  2. Produce tailboard safety topics and attendance records
  3. Log material deliveries, compaction tests and survey shots
  4. Document progress photos and quantities installed
  5. Flag any deviations from plans for engineering review

Watch for: Compaction and material density tests must be performed by certified technicians; Stormwater best management practices must be inspected daily

Progress billing and pay applications

Starts when: Monthly or at contract milestones

  1. Calculate quantities completed this period from field records
  2. Gather subcontractor invoices and lien waivers
  3. Prepare schedule of values and supporting documentation
  4. Draft the pay application and change order log
  5. Track retainage and submit for client approval

Watch for: Public owners often require certified payroll reports with each billing; All subcontractors must submit conditional or unconditional lien waivers

Project closeout and punch list

Starts when: Substantial completion or client notice

  1. Compile as-built drawings, warranties and operation manuals
  2. Generate punch list from final walkthrough
  3. Track completion of punch list items and re-inspections
  4. Prepare final billing, release of retainage and lien releases
  5. Close permits and submit notice of completion

Watch for: Many municipalities require record drawings stamped by a licensed engineer; Final lien waivers from every subcontractor are mandatory before final payment

Bot templates for this industry

Source: U.S. Small Business Administration, Office of Size Standards, Table of Small Business Size Standards Matched to North American Industry Classification System Codes, version March 2023 (effective 2023-03-17, NAICS 2022). Size standards are shown for reference only.