Tile and Terrazzo Contractors

NAICS 238340 · Specialty Trade Contractors · SBA size standard: $19 million average annual receipts

Tile and terrazzo contractors bid on residential and commercial jobs, prepare substrates, set tile or pour terrazzo, grout and finish surfaces. For a crew that handles custom bathroom remodels, kitchen backsplashes and commercial lobby floors, the specialists turn bid requests into accurate estimates, estimates into material orders and schedules, job sites into sequenced tasks with inspections, and completed work into invoices and punch lists. Layout patterns, substrate tolerances and material waste stay with the lead tile setter.

Start with these bots

What makes this business different

  • Accurate takeoffs from architectural drawings that include waste factors for cut tile and terrazzo chips
  • Substrate preparation and moisture testing before setting materials, with documented approvals
  • Job sequencing that coordinates with other trades such as plumbing, electrical and drywall
  • Material orders with exact color lots, sizes and quantities to avoid variation across the job
  • Daily protection of finished work from foot traffic and subsequent trades
  • Local building permits, trade licenses, inspection sign-offs and safety documentation
  • Change orders for field conditions that alter quantities or scope after work begins

Specialist bots

  • a worker at a jobsite trailer desk measuring dimensions on large blueprint sheets spread across a table with a calculator and notepad

    Estimating Specialist

    Convert plan sets and specifications into accurate material and labor bids for tile and terrazzo work.

    Works in: Ambitious Sheets, Ambitious Docs, Ambitious Tasks · Workflows: Bid and estimate preparation

    Automates

    • Extracts quantities from drawings
    • Applies waste factors and unit costs
    • Builds the bid spreadsheet with labor and equipment
    • Drafts the proposal document
    • Organizes supporting files

    Stops for a person

    • The owner reviews and adjusts all final bid numbers
    • Scope exclusions and assumptions are confirmed by the owner before submission
  • a worker in a warehouse aisle inspecting pallets of boxed tile and loose terrazzo aggregate against an order checklist

    Material Procurement Coordinator

    Turn approved project quantities into purchase orders and track material deliveries to the job site.

    Works in: Ambitious Sheets, Ambitious Docs, Ambitious Tasks · Workflows: Material ordering and inventory

    Automates

    • Calculates final order quantities with waste
    • Creates purchase orders by supplier
    • Tracks delivery dates against schedule
    • Logs received materials and discrepancies
    • Flags upcoming reorders

    Stops for a person

    • The owner approves all purchase orders before they are sent
    • Color lot selections and substitutions are confirmed by the lead installer
  • a worker standing at a plywood wall pinning printed schedule strips next to a calendar and project photos

    Project Scheduler

    Build and maintain the job schedule that coordinates tile and terrazzo work with other trades and inspections.

    Works in: Ambitious Sheets, Ambitious Tasks, Construction Scheduler · Workflows: Project scheduling and trade coordination

    Automates

    • Creates the baseline schedule from contract dates
    • Sequences prep, setting, grouting and finishing
    • Inserts trade coordination milestones
    • Updates schedule when delays are reported
    • Highlights upcoming inspection windows

    Stops for a person

    • The owner and lead installer approve the final schedule
    • Schedule changes that affect contract dates require owner approval
  • a worker kneeling on a concrete floor using a straightedge and level to check flatness while marking layout lines with a chalk reel

    Field Work Coordinator

    Generate daily task lists, quality checklists and documentation for crews on active job sites.

    Works in: Ambitious Tasks, Ambitious Docs, Ambitious Sheets · Workflows: Field work and quality control

    Automates

    • Creates daily crew assignments from the schedule
    • Generates substrate and setting checklists
    • Tracks material usage versus estimate
    • Organizes progress photos by location
    • Builds the punch list from site reports

    Stops for a person

    • The lead installer confirms layout and quality standards each day
    • All corrective actions are directed by the owner or lead installer
  • a worker at a temporary plywood desk organizing permit documents and moisture meter readings into a binder at a construction site

    Compliance and Inspection Clerk

    Assemble documentation packages for permits, inspections and safety records while tracking renewal dates.

    Works in: Ambitious Docs, Ambitious Tasks, Ambitious Sheets · Workflows: Inspection and permit management

    Automates

    • Builds inspection submittal packages
    • Generates request forms for building officials
    • Logs inspection results and required corrections
    • Tracks license and permit expiration dates
    • Maintains safety and training records

    Stops for a person

    • The owner confirms all jurisdiction-specific requirements
    • People attend inspections and sign off on corrective work
  • a worker measuring an irregular wall opening with a tape measure and taking notes on a clipboard beside exposed plumbing lines

    Change Order Manager

    Document field conditions, calculate impacts and draft change order proposals for additional tile or terrazzo work.

    Works in: Ambitious Docs, Ambitious Sheets, Contract Analyzer · Workflows: Change order processing

    Automates

    • Documents existing conditions with photos
    • Calculates additional quantities and labor
    • Drafts the change order form and narrative
    • Tracks approval status
    • Updates the material schedule once approved

    Stops for a person

    • The owner reviews and signs every change order before work begins
    • The lead installer verifies all field measurements used in the proposal
  • a worker reviewing printed invoices and lien waiver forms at a folding table inside a finished tiled commercial lobby

    Billing and Closeout Administrator

    Prepare progress invoices, compile closeout documents and track retention and lien waivers.

    Works in: Ambitious Sheets, Ambitious Docs, Ambitious Tasks · Workflows: Progress billing and project closeout

    Automates

    • Calculates percent complete by task
    • Drafts invoices with backup documentation
    • Assembles lien waivers and warranty letters
    • Tracks retention release dates
    • Organizes final project records

    Stops for a person

    • The owner approves every invoice before it is sent
    • All final lien waivers and warranties are reviewed and signed by the owner

Workflows

Bid and estimate preparation

Starts when: Receipt of a new project inquiry, plan set or request for proposal

  1. Extract square footage, linear footage and pattern details from drawings
  2. Calculate material quantities including waste for cuts and breakage
  3. Apply labor hours by difficulty and access conditions
  4. Draft the full bid proposal with scope, exclusions and schedule
  5. Assemble supporting documents for submission

Watch for: Tile patterns and terrazzo mixes must be priced accurately to prevent underbidding; Site access, stair counts and vertical transport affect labor estimates

Material ordering and inventory

Starts when: After contract award and before mobilization

  1. Finalize quantities from approved shop drawings and field measurements
  2. Select and confirm exact color lots from suppliers
  3. Draft purchase orders for tile, terrazzo aggregates, thinset, grout and setting materials
  4. Track deliveries against job schedule and storage limitations
  5. Log received materials and handle damaged or incorrect shipments

Watch for: Color consistency across multiple deliveries is critical for visible work; Heavy materials require staging plans and protection from weather

Project scheduling and trade coordination

Starts when: Contract signing and receipt of notice to proceed

  1. Build a detailed schedule showing substrate prep, setting, grouting and finishing
  2. Coordinate with general contractor and other trades for access windows
  3. Assign crew and equipment to each phase
  4. Update schedule when delays from other trades occur
  5. Flag upcoming inspections

Watch for: Substrate must be dry and flat within industry tolerances before tile or terrazzo begins; Curing times for terrazzo and grout affect follow-on trades

Field work and quality control

Starts when: Daily at job start or phase transition

  1. Generate daily task list for layout, cutting, setting or finishing
  2. Create substrate inspection checklist including flatness and moisture readings
  3. Track material usage against estimate
  4. Document photos of work in progress and completed stages
  5. Prepare punch list items for final walkthrough

Watch for: Layout lines and expansion joints must follow architectural intent and industry standards; Protection of finished floors from subsequent construction activity is required

Inspection and permit management

Starts when: At each required inspection milestone and permit renewal

  1. Assemble required documentation for substrate, setting and final inspections
  2. Draft inspection request forms for the authority having jurisdiction
  3. Log results and any corrective actions required
  4. Track license and bond renewal dates
  5. Maintain safety and accident logs

Watch for: Inspection requirements vary by jurisdiction and project type; The lead installer confirms all field measurements and conditions

Change order processing

Starts when: When field conditions differ from original plans or owner requests modifications

  1. Document existing conditions with photos and measurements
  2. Calculate additional labor and material quantities
  3. Draft change order proposal with cost and schedule impact
  4. Track approval status
  5. Update material orders and schedule once approved

Watch for: Change orders must be approved in writing before additional work begins; Extra material may have long lead times or lot variations

Progress billing and project closeout

Starts when: At billing milestones and project completion

  1. Calculate percentage complete based on tasks finished
  2. Draft invoice with supporting documentation
  3. Assemble final lien waivers, warranties and as-built documentation
  4. Create final punch list and track completion
  5. File project records for retention

Watch for: Retention is commonly held until final sign-off and lien period expires; Warranties for materials and workmanship must be collected from suppliers

Bot templates for this industry

Source: U.S. Small Business Administration, Office of Size Standards, Table of Small Business Size Standards Matched to North American Industry Classification System Codes, version March 2023 (effective 2023-03-17, NAICS 2022). Size standards are shown for reference only.